These items need to be fixed
- mcelog needs to be installed and evaluated
- maybe the former two and smartctl can be integrated into single script (Carsten has some old template for that)
These are fixed (please include who solved these and how)
- [Carsten] Create tick-list from Leistungsverzeichnis which needs to be fulfilled by Pyramid.
- benchmark runs need to be performed
- "stress" needs to be run multiple times to really try to kill the hardware
- hardware evaluation needs to be performed, i.e. 2-3 boxes need to be opened and investigates if everything is fine, e.g. if we can mount another hdd into the secondary drive bay easily
- temperature monitoring needs be set (much higher) 55C at least
This topic: ATLAS > FirstTestComputeNodes
Topic revision: 09 Jan 2008, Carsten